Upshur Rural Electric Cooperative Corporation Data Access Guide
Upshur Rural Electric Cooperative Corporation (URECC) is a member-owned electric cooperative serving roughly 51,500 meters across 10 counties in rural Northeast Texas. As a cooperative that has opted out of ERCOT retail competition, URECC operates on regulated, board-approved rate schedules and delivers customer data access through the NISC SmartHub portal.
How to Get Your Upshur Rural Electric Cooperative Corporation Data: All Access Methods
| Method | 1st Party | 3rd Party | Customer Types | Data Types | Latency | Format |
|---|---|---|---|---|---|---|
| SmartHub Billing Portal | ✓ | — | Residential, Commercial, Industrial | Billing history, statements, payments | Near real-time / monthly | PDF, limited CSV |
| SmartHub Usage / Interval Data | ✓ | — | Residential, Commercial, Industrial | Hourly usage (15-min at meter) | Daily | Charts, hourly CSV, JSON (unofficial API) |
| Customer-authorized manual export | — | ✓ | Commercial, Industrial | Billing and usage exports | On demand (manual) | PDF, CSV |
| Member Services authorization | — | ✓ | Commercial, Industrial | Billing, usage, interval (as available) | 2-4 weeks setup | PDF, CSV, varies |
Billing Data Access
URECC delivers billing data through the NISC SmartHub portal (web and mobile app). Members can view current balances, complete billing history, and download PDF statements. There is no documented Green Button, public API, or formal third-party billing-data program; third-party access requires written customer authorization under Texas privacy rules.
What Data Is on Your Upshur Rural Electric Cooperative Corporation Bill
- Current account balance and due date
- Complete billing/payment history
- Downloadable PDF statements
- Monthly usage summaries
- Account summary information
How to Download Upshur Rural Electric Cooperative Corporation Bills (Business & Commercial)
- 01Register the business account at https://urecc.smarthub.coop/
- 02Locate the account number from a recent URECC invoice
- 03Open the Billing section to view statement history
- 04Download PDF statements for accounting or energy-management use
- 05For bulk or programmatic billing data, contact Member Services at memberservice@urecc.coop or 903-843-2536 to discuss arrangements
How to Download Upshur Rural Electric Cooperative Corporation Bills (Residential)
- 01Visit https://urecc.smarthub.coop/ or download the URECC SmartHub mobile app
- 02Register using your email address and URECC account number
- 03Verify identity (account number, service address, last 4 of SSN)
- 04Set up online access credentials
- 05Navigate to the Billing / Bill Pay section
- 06View and download current and historical bills as PDFs
Third-Party Access to Upshur Rural Electric Cooperative Corporation Billing Data
Manual customer-authorized export
- 01Member logs into SmartHub and downloads PDF/CSV billing data
- 02Member shares exported files with the authorized consultant or energy manager
- 03No formal data-sharing agreement or API access required
Formal authorization via Member Services
- 01Obtain written authorization from the member-owner
- 02Contact URECC Member Services at 903-843-2536 or memberservice@urecc.coop
- 03Submit the signed authorization form
- 04URECC advises on available formats and delivery method
Want to understand the charges on your bill?
See the Upshur Rural Electric Cooperative Corporation Rate Schedules & Tariff Guide →Interval Data & Smart Meters
URECC has deployed AMI smart meters across its territory and exposes usage data through the NISC SmartHub portal. Standard public exports provide hourly granularity; underlying meters support 15-minute interval data, which advanced users have retrieved via the (unofficial) reverse-engineered SmartHub JSON API. No official Green Button/ESPI program exists.
How to Download Upshur Rural Electric Cooperative Corporation Interval Data via Green Button
- 01URECC does not offer a Green Button Download My Data or Connect My Data program
- 02To approximate interval export, log into SmartHub and use the My Usage / Energy Use section
- 03Select the desired time period and use the CSV download where available (hourly granularity as of 2024)
- 04For 15-minute data, members may inquire with Member Services or use third-party tooling at their own risk
Interval data is essential for rate comparison and TOU analysis.
See which Upshur Rural Electric Cooperative Corporation rate schedule is best for your usage pattern →Third-Party API Access
URECC does not maintain a public developer portal or official API. SmartHub is operated by NISC; URECC has limited control over API offerings. A reverse-engineered SmartHub JSON API exists in the developer community but is unofficial and may violate terms of service. Businesses needing programmatic access should contact URECC/NISC directly.
Available Upshur Rural Electric Cooperative Corporation API Endpoints
| Function | Endpoint | Method | Format |
|---|---|---|---|
| Usage data (unofficial community API) | https://urecc.smarthub.coop/ (reverse-engineered JSON endpoints) | GET | JSON |
How to Register as a Upshur Rural Electric Cooperative Corporation API Vendor
- 01Contact URECC Member Services at 903-843-2536 or memberservice@urecc.coop
- 02Request third-party API or data-integration options and describe the use case
- 03Provide signed customer authorization
- 04URECC evaluates feasibility and may escalate to NISC for a custom data-sharing arrangement
EDI (Electronic Data Interchange)
Supported Upshur Rural Electric Cooperative Corporation EDI Transaction Sets
| Code | Name | Purpose |
|---|---|---|
| 810 | Invoice | Electronic delivery of invoices (only if supported via inquiry; no formal program). |
| 820 | Payment Order/Remittance Advice | Electronic payment and remittance processing (only if supported via inquiry). |
How to Enroll in Upshur Rural Electric Cooperative Corporation EDI
- 01Contact URECC Member Services at 903-843-2536
- 02Email memberservice@urecc.coop and request a business account representative
- 03Ask about EDI invoice (810) and payment/remittance (820) capabilities
- 04If URECC cannot support EDI directly, request referral to its G&T provider (NTEC)
Sources
Rate Schedules & Tariff Analysis
URECC C&I pricing is driven by load factor and demand. Schedule B carries the highest energy rate ($0.097067/kWh) but a nominal $0.70/kW demand charge, making it suitable for low-demand single-phase loads. Schedule C and LPI trade a higher fixed/demand structure for materially lower energy rates ($0.071262 and $0.048059/kWh respectively). URECC automatically reviews each December and reclassifies members onto the most favorable of Schedule C vs. LPI, so demand profile and the 85% demand ratchet (Schedule C) are the key cost levers. The PCRF rider applies to every kWh.
Upshur Rural Electric Cooperative Corporation Rate Schedule List
| Schedule | Applicability |
|---|---|
| Schedule B - Small Commercial and General Service | Single-phase commercial/general service under ~50 KVA transformer capacity. |
| Schedule C - Commercial and Industrial Power Service | Three-phase C&I service, estimated demand 50 kW or less initially. |
| Schedule LPI - Large Power Service, Industrial | Three-phase loads over 50 kW maintained 9+ months/year. |
Upshur Rural Electric Cooperative Corporation Rate Features & TOU Details
- Demand billed on the maximum consecutive 15-minute kW
- Power-factor adjustment increases billed demand 1% per 1% below 0.95 PF
- Schedule C minimum = greater of base charge or 85% of highest demand in prior 11 months
- Annual December review reclassifies members to the cheaper of Schedule C or LPI
- PCRF rider adjusts all kWh charges monthly (base power cost $0.076116/kWh)
For a deeper analysis including cost optimization strategies and historical rate trends:
Read the full Upshur Rural Electric Cooperative Corporation Rate Optimization Guide →Other Data Access Programs
Power2Go Prepaid Service
URECC offers a Power2Go prepaid electricity program for residential and small commercial accounts, with daily usage tracking and real-time balance visibility through the URECC/SmartHub app.
- 01Submit a Prepaid Metering Application and Agreement
- 02Fund the prepaid account (establishment balance $35.00)
- 03Monitor daily balance and usage via SmartHub
- 04Set low-balance notifications
Distributed Generation / Generation Rider (Rider G)
Members with on-site generation or storage up to 100 kW can interconnect under Rider G, receiving bill credits for exported energy (Class I at retail energy rate; Class II at power-supplier avoided cost, plus a $5.00/month DG charge).
- 01Submit the DG Interconnection Application and pay the class-based application fee
- 02Execute the Interconnection Agreement
- 03Interconnect in parallel per URECC DG Policy
- 04Receive monthly energy bill credits per Rider G
Beat The Peak
URECC's Beat The Peak demand-response awareness program notifies members of high-demand periods so they can voluntarily reduce usage and help lower wholesale power costs (which flow through the PCRF rider).
- 01Enroll via the URECC Beat The Peak page
- 02Receive peak-alert notifications
- 03Voluntarily reduce non-essential load during alerts
Limitations & Considerations
- ⚠No official Green Button (Download My Data or Connect My Data) or ESPI support.
- ⚠No public developer portal or official API; only an unofficial reverse-engineered SmartHub API exists.
- ⚠No formal third-party data-sharing program; third-party access requires customer authorization.
- ⚠Standard SmartHub usage exports are limited to hourly granularity (15-minute only at meter/unofficial-API level).
- ⚠No documented EDI trading-partner program; 810/820 support only by direct inquiry.
- ⚠Member opted out of ERCOT retail choice, so no competitive supplier shopping is available.
Upshur Rural Electric Cooperative Corporation Data Access FAQ
Which URECC rate schedule applies to my commercial or industrial facility?▾
Single-phase commercial sites typically fall under Schedule B. Three-phase facilities up to about 50 kW of demand are served under Schedule C ($0.071262/kWh energy + $7.25/kW demand), and loads sustaining over 50 kW for at least nine months a year qualify for Schedule LPI ($0.048059/kWh energy + $15.75/kW demand). URECC reviews accounts each December and automatically places qualifying members on whichever of Schedule C or LPI is cheaper.
How is my demand charge calculated, and is there a ratchet?▾
Billing demand is the maximum kilowatt demand over any consecutive 15-minute period in the month, adjusted for power factor. On Schedule C, the minimum monthly charge is the greater of the base charge or 85% of the highest demand established in the preceding 11 months, so a single high peak can elevate bills for nearly a year.
Does URECC offer Green Button or an API for usage data?▾
No. URECC does not offer Green Button Download My Data, Connect My Data, or an official public API. Usage and billing data are available through the NISC SmartHub portal as charts, limited CSV, and PDF. A reverse-engineered community SmartHub API exists but is unofficial and may violate terms of service.
Can my energy consultant or aggregator access my URECC data?▾
There is no formal third-party data program. Access is through customer-authorized SmartHub exports or by filing written authorization with URECC Member Services (903-843-2536 or memberservice@urecc.coop) under Texas customer-privacy rules (16 TAC 25.44 and 25.472). Nectar provides API access to this utility's billing data with member authorization — see docs.nectarclimate.com.
What is the PCRF rider and how does it affect my bill?▾
The Power Cost Recovery Factor (PCRF) rider adjusts every kWh charge monthly to reflect the difference between URECC's actual purchased-power cost and the base power cost embedded in rates ($0.076116/kWh). It applies on top of all schedule charges and does not count toward minimum charges, so your effective energy rate can move month to month with fuel and wholesale costs.
Can a commercial member install solar and get bill credits?▾
Yes. Under Rider G, members can interconnect distributed generation or storage up to 100 kW. Class I facilities (<=50 kW) receive energy credits at the applicable schedule's retail energy rate; Class II facilities (>50-100 kW) receive credits at the power supplier's avoided cost plus a $5.00/month DG charge. Credits apply only against energy charges and cannot create a net cash credit for over-generation.
The Best Way to Access Data from Upshur Rural Electric Cooperative Corporation
Nectar connects to Upshur Rural Electric Cooperative Corporation and 7,000+ utility providers — billing, interval, and rate data delivered automatically. No portals, no forms, no manual downloads.
Nectar for Energy & Sustainability Teams
Managing utility data for commercial or industrial buildings? Nectar offers a free energy data audit — we'll review your current setup and show you where automation can save your team hours every month.
Get a Free AuditNectar for Developers & Consultants
Building energy tools or advising clients on utility data? Nectar works with technology partners and consultants who need reliable data infrastructure.
Partner with Us